03 30 00 CastinPlace Concrete palmbeachschools

Leave Comment

03 30 00 Cast-in-Place Concrete - palmbeachschools

Architect’s Project Number 03 30 00-5 of 6 Cast-in-Place Concrete District Master Specs 2010 Edition A. Place concrete in accordance with ACI 301. B.

Get price

03 30 00

SECTION 03 30 00. CAST-IN-PLACE CONCRETE. PART . 1. GENERAL. SECTION INCLUDES. Cast-in-place concrete building frame members, floors, shear walls, elevator

Get price

SECTION 03 30 00, CAST-IN-PLACE CONCRETE

12/02/2020 07:42:00 Title: SECTION 03 30 00, CAST-IN-PLACE CONCRETE Subject: Master Construction Specifications Description: This section specifies

Get price

03 30 00 - Cast-In-Place Concrete

CAST-IN-PLACE CONCRETE RELEASE – R3.0 SECTION 03 30 00 BART FACILITIES STANDARDS Issued: January 2013 PAGE 2 OF 9 STANDARD SPECIFICATIONS two square feet. b.

Get price

SECTION 03 30 00 CAST-IN-PLACE CONCRETE PART 1: GENERAL

Cast-In-Place Concrete Revised June 2013 03 30 00-3 from dirt, detrimental rust, loose scale, paint, oil or other foreign material. When spacing between

Get price

03 30 00

03 30 00-5 of 6 Cast-in-Place Concrete DMS 2020 Edition . 1. Maintain correct position to allow joint cover to be flush with floor and wall finish. M. Install

Get price

The School District of Palm Beach ... - palmbeachschools

Section 03 30 00 – Cast in place concrete 2. Section 04 20 00 –Masonry Unit 3. Section 04 20 10 – Reinforced Masonry Unit 4. Section 07 95 13 – Expansion

Get price

SECTION 03 30 00 CAST-IN-PLACE CONCRETE PART 1:

Cast-In-Place Concrete Revised June 2013 03 30 00-3 from dirt, detrimental rust, loose scale, paint, oil or other foreign material. When spacing between crossing bars is greater than one foot, tie all bars at all intersections. When spacing is less than one foot in each direction, tie alternate intersections of bars.

Get price

03 30 00 - Cast-In-Place Concrete - Alberta

Green Building Notes Section 03 30 00. 2019-06-05 Cast-In-Place Concrete TS Technical Specification Infrastructure. Technical Specification System Page 0 Section 03 30 00. Plan No: Cast In Place Concrete. Project ID: Page 20 2019-06-05 TS Version Withdrawn Jan 2005. Withdrawn. Withdrawn Feb 2012. Withdrawn

Get price

03 30 00 Cast-in-Place Concrete - Full - UH

SECTION 03 30 00- CAST-IN-PLACE CONCRETE. GENERAL. RELATED DOCUMENTS. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division-01 Specification sections, apply to work of this section.

Get price

03 30 00 Cast-in-Place Concrete

DIVISION 03 – CONCRETE SECTION 03 30 00 – CAST‐IN‐PLACE CONCRETE Herbert, Rowland Grubic, Inc. 03 30 00‐8 007698.0427 C. Notify Engineer minimum 24 hours prior to commencement of each significant pour. Engineer shall define "significant pour" based upon Contractor’s work plan. D.

Get price

UFGS 03 30 00 Cast-In-Place Concrete WBDG - Whole ...

Feb 01, 2019  Superseding UFGS 03 30 00.00 20 Cast-in-Place Concrete and UFGS 03 30 00.00 40 Cast-in-Place Concrete. Participating Agencies. About WBDG. WBDG is a gateway to up-to-date information on integrated 'whole building' design techniques and technologies. The goal of 'Whole Building' Design is to create a successful high-performance building by ...

Get price

03 30 00 Cast-in-Place Concrete - ZeroDocs

Cast-in-Place Concrete. Use this CSI 3 part SimpleSpecs™ master specification to specify cast-in-place concrete for use in site construction, foundations, floor slabs, building frames, mechanical pads, and other uses.. This section may be cross-referenced from other sections that require cast-in-place concrete. Concrete for structural uses is often covered by general notes contained on ...

Get price

Cast-in-Place Concrete - MasterFormat 03 30 00 - BuildSite

Mar 30, 2000  Cast-in-Place Concrete (03 30 00) 19 Cast-in-Place Concrete products from 4 Manufacturers. Products. Manufacturers. Show filters. Sponsored Results. Product name. ACCELGUARD AcN 200.

Get price

03 30 00 - Cast-in-Place Concrete ARCAT

Mar 31, 2016  03 30 00 - Cast-in-Place Concrete Manufacturers of Cast-in-Place Concrete Browse companies that make cast-in-place concrete and view and download their free cad drawing, revit BIM files, specifications and other content relating to cast-in-place concrete as well as other product information formated for the architectural community.

Get price

DIVISION 3 CONCRETE

Revised Jan-15 Cast in Place Concrete-03 30 00-6 Marcos may, at their discretion, direct the Contractor to perform additional testing at no additional cost to Texas State University. 3.07 Testing of Deficient In-place Concrete A. The strength of the concrete will be considered potentially deficient if the averages of ...

Get price

JAMES B. PIRTLE CONSTRUCTION CO., INC

site concrete cast in place concrete shell resilient flooring carpet concrete tilt-up panels door hardware installation doors, frames hardware 11-400 354,000 lace foodservice 361,000 11-452 18,000 sears 14,830 12-360 display casework 8,000 all specialty 2,026 12-600 pencils electric sharpeners 6,000 allowance 3,500 12-690 entry mats ...

Get price

GEE Builders - Coral Springs, Florida ProView

03 06 30 - Schedules for Cast-in-Place Concrete 03 06 ... 03 06 30.26 - Concrete Beam Schedule 03 11 13.13 - Concrete Slip Forming 03 30 53 - Miscellaneous Cast-in-Place Concrete 03 31 13 - Heavyweight Structural Concrete 03 31 23 - High ... 35 70 00.00.01 - Dam Construction and Equipment

Get price

Facilities Construction Management / Overview

The Office of Facilities Construction is committed to providing safe and secure facilities by encouraging a positive learning environment through design, construction, improvement, and maintenance of educational facilities.. To ensure equity among schools regarding the Broward County Public Schools SMART initiative, a comprehensive Facility Needs Assessment was conducted district wide.

Get price

100 Portofino Dr, Palm Beach Gardens, FL 33418 Homes

This Apartment is located at 100 Portofino Dr, Palm Beach Gardens, FL and was last sold on 04/13/2017 for 103,600,000.00. This property was originally built in 2002. 100 Portofino Dr is within the school district Palm Beach Schools with nearby schools including Marsh Pointe Elementary School, Watson B. Duncan Middle School, and William T. Dwyer High School.

Get price

O2B Kids at Spring Isle - constructionjournal

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete. Division 04 - Masonry, Unit Masonry. Division 05 - Metals. Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry. Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection ...

Get price

03 30 00 - Cast-In-Place Concrete - Alberta

Green Building Notes Section 03 30 00. 2019-06-05 Cast-In-Place Concrete TS Technical Specification Infrastructure. Technical Specification System Page 0 Section 03 30 00. Plan No: Cast In Place Concrete. Project ID: Page 20 2019-06-05 TS Version Withdrawn Jan 2005. Withdrawn. Withdrawn Feb 2012. Withdrawn

Get price

SECTION 03 30 00, CAST-IN-PLACE CONCRETE

This section specifies cast-in-place structural concrete and materials and mixes for other concrete. Last modified by: DIRKALLE Created Date: 10/4/2011 3:18:00 PM Company: Toshiba Other titles: SECTION 03 30 00, CAST-IN-PLACE CONCRETE

Get price

03 30 00 - Fort Worth, Texas

03 30 00 - 1 CAST-IN-PLACE CONCRETE Page 1 of 25 CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS [Insert Project Number] Revised December 20, 2012 SECTION 03 30 00 CAST-IN-PLACE CONCRETE PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Cast-in place concrete, including formwork, reinforcement, concrete ...

Get price

DIVISION 3 – CONCRETE 03 30 00 CAST-IN-PLACE

03 30 00 CAST-IN-PLACE CONCRETE 1) Concrete Work Definitions and Applications: a. Exposed exterior flatwork shall be defined as the following: i. Sidewalks, curb, gutter, driveways, paving, landings, aprons, stairs, etc., and which are exposed to exterior freeze/thaw conditions, heavy deicer use and heavy snow removal ...

Get price

SECTION 03 30 53 - (SHORT-FORM) CAST-IN-PLACE

SECTION 03 30 53(Short Form) CAST-IN-PLACE CONCRETE. ... If using resilient covering on concrete, use specification Section 03 30 00, CASTINPLACE CONCRETE. 5. Refer to Section 03 30 00, CASTINPLACE CONCRETE for large projects or when more scope is required. GENERAL. SUMMARY.

Get price

03 30 00 Cast-in-Place Concrete - Christenson Corporation

SECTION 03 30 00 CAST-IN-PLACE CONCRETE 03 30 00-2 13-HC1-033 1.03 SUBMITTALS A. Submit for approval the name of the agency proposed for the required inspection and testing services. All of the required field testing and sampling is to be performed by personnel employed by the proposed agency.

Get price

03 30 00 Cast-in-Place Concrete - kugan

03 30 00 Cast‐in‐Place Concrete Item No Description Preparatory Initial Follow ‐ Up 34 Define test sample storage location 35 Test sample storage location is away from weather extremes and movement 36 Vibration performed properly 37 Watering and drainage methods determined 38

Get price

SECTION 03 30 00 CAST-IN-PLACE CONCRETE PART 1

Mar 03, 2017  City of Lancaster Cast-In-Place Concrete Standard Details and Specifications 03 30 00 - 5 C. Glass Fiber Fabric Reinforced Plastic Forms: Matched, tight fitting, stiffened to support weight of concrete without deflection detrimental to tolerances and appearance of finished concrete surfaces.

Get price

CSI SECTION 03 31 19 – SHRINKAGE-COMPENSATING

03 30 00 – CAST-IN-PLACE CONCRETE System-K™ Shrinkage-Compensating Cement Concrete with Integral Microfiber Reinforcement and Perimeter Steel for Non-Structural Slabs on Grade and Topping Slabs EDITOR NOTE: The following guideline specification has been prepared to

Get price

High-Performance, Polishable Concrete Topping

least 100 ft. [30,5 m] of hose) or a batch mixer and pump (with at least 50 ft. [15,2 m] of hose). Mixer and pump must be in good working condition. Periodic cleaning of ... Concrete Topping 03 53 00 Cast-in-Place Concrete 03 30 00 Packaging Product Code Size 15950 Bag: 50 lbs. (22,7 kg) Approximate Coverage* per 50 lbs. (22,7 kg)

Get price

MASTER CONSTRUCTION SPECIFICATIONS (PG-18-1) - Office of ...

Aug 23, 2021  03 30 00: Cast-in-Place Concrete: 2021-01: 03 30 53 (Short-Form) Cast-in-Place Concrete: 2021-01: 03 37 13: Shotcrete: 2021-01 : 03 41 13: Precast Concrete Hollow Core Planks: 2021-01: 03 41 33: Precast Structural Pretension Concrete: 2021-01: 03 45 00: Precast Architectural Concrete: 2021-01: 03 51 13: Cementitious Wood Fiber Decks: 2021-01 ...

Get price

RevitCity Objects

Jan 12, 2015  Anywhere on MF04 Tree 01 - General Requirements (265) 01 50 00 - Temporary Facilities Controls (55) 01 52 00 - Construction Facilities (19) 01 53 00 - Temporary Construction (4) 01 54 00 - Construction Aids (3) 01 56 00 - Temporary Barriers Enclosures (7) 01 58 00 - Project Identification (2) 02 - Existing Conditions (32) 03 - Concrete (192 ...

Get price

1 Auditorium Cir, Wrightsville Beach, NC 28480 - realtor®

Sep 12, 2017  View 44 photos for 1 Auditorium Cir, Wrightsville Beach, NC 28480 a bed, bath, 0.24 acres. land built in that sold on 04/19/2018.

Get price

UFDC Home - All Collection Groups

Aapex Mortgage 6.125 30 6.375 30 No 30 Heidelberg Capital Corp. 5.500 30 5.875 30 No 30 877-839-9829 0 0 Quote 800-968-2240 0 0 Quote Absolute Mortgage Co. 5.625 30 5.875 30 4.875 30 Magnolia Mortgage Corp. 6,000 30 6.250 30 No 30 888-90-HOMES 0 0 0 VA 800-392-6851 0 0 Quote

Get price
Contact us

Submit online

Please leave a message below and we will contact you as soon as possible.